Measurements of the Overload Behaviour (110%) of a Circulating Fluidised Bed Steam Generator
Project Leader: | Professor Dr-Ing Otto Geisler |
Research Assistant: | Dipl-Ing S Buse |
Duration: | 01.09.1997 - 30.11.1997 |
From extensive measurements in a brown coal-fired circulating fluidised bed steam generator it was found that an overload operation at up to 110% nominal load was possible, without posing any dangers to the plant and whilst still obeying the emission limit values applicable.